Major Electrical Utility

Thumbnail for the case study: migration from Infor EAM to Maximo at a power utility

For a major electrical utility, the Maxis Technology team migrated the legacy Infor EAM of a large international business unit into the company’s standardized US Corporate Maximo system, using the flexibility of the Alchemize platform.

The flexibility of our Alchemize platform was fully leveraged for a Major Electrical Utility while migrating the legacy Infor EAM for their large international business unit into the US Corporate Maximo standardized system. At the end of the go/no-go meeting for cut-over, the business informed us that:

  • There were tax changes in one country that needed to be incorporated into the merger
  • They needed to change the GL account structure at the last minute
  • The currency conversion rules had changed
  • They had not considered SOX requirements and needed to redesign how purchase orders were to be migrated

The project manager scheduled a meeting the next morning to strategize, and our team was able to meet the changed requirements overnight and were ready for the scheduled go-live date.

The project manager called a strategy meeting the next morning, and the Maxis team delivered the changed requirements overnight, keeping the scheduled go-live date. Read the full case study on alchemize.io, or talk to our Maximo team.